• Tower Crane Control Panels
  • Tower Crane Control Panels
  • Tower Crane Control Panels
  • Tower Crane Control Panels
  • video

Tower Crane Control Panels

  • SYM
  • SHENYANG,CHINA
  • 7-15
  • Powerful
The main components use the Schneider brand, including frequency converters. The control cabinet has two kinds of shells: stainless steel and iron plate. The overall installation of the plate, the direct riveting of the spare cap, the components are more firmly fixed. Standardize the wiring in the cabinet to reduce the occurrence of wiring faults. It is connected with external wiring by connectors, which is convenient for disassembly and assembly and reduces the occurrence of failures. The cabinet door is affixed with company logos and warning and reminder marks.

 

 

 

Control panel

hoisting control panel

The main components use the Schneider brand, including frequency converters.The control cabinet has two kinds of shells: stainless steel and iron plate.The overall installation of the plate, the direct riveting of the spare cap, the components are more firmly fixed;Standardize the wiring in the cabinet to reduce the occurrence of wiring faults;

 

 

 

Marks

slewing trolley panel

①A traceability code is attached to the outside of the control cabinet.

②The control cabinet is tested before delivery,and the qualified mark.

③The cabinet door is affixed with company logos and warning and

 reminder marks.④Electrical drawings puts in the control cabinet.


resistance box

hoisting control panel

  • What are the safety devices for tower cranes?

    Tower crane include limits, insurance and other safety devices. Limit safety device: lifting moment limiter, lifting weight limiter, lifting height limiter, amplitude limiter, travel limiter, etc. Safety device: hook insurance, wire rope drum insurance, ladder guardrail and so on. Other safety devices: rail clamp, anemometer, wire rope anti-stripping groove, tower black box, etc.

  • Do you test all your goods before delivery?

    Yes, we have 100% test before delivery.

  • What certificates do you have?

    CE, TUV, ISO9001

  • How long is your delivery time?

    Generally 7-15 days after advance payment.

Related Products

Get the latest price? We will reply as soon as possible (within 12 hours)